Leif Ericson Elementary Scholastic Academy
美国伊利诺伊州芝加哥市
bKL completed three fast-track projects that were critical to ensuring welcoming environments for Chicago Public Schools students upon the start of the school year. All three projects had the same schedules, with design and construction occurring within a limited time frame of 10 total weeks.
A variety of interior and exterior renovations were provided for Leif Ericson Elementary Scholastic Academy. These included classroom, auditorium, library, dining, corridor and toilet room renovations, as well as the remodeling of exterior entrance access routes.
In addition to aesthetic improvements, provisions were made for air conditioning and wireless access points in compliance with the CPS mission to enhance technology and provide climate controlled learning environments.
- 设计
- 2013
- 施工
- 2013
- 项目面积
- 78,000 平方英尺
- 顾问
- Melvin Cohen and Associates, MEP; MFH Associates, 结构
- 承建商
- F.H. Paschen
- 摄影
- Darris Lee Harris