Leif Ericson Elementary Scholastic Academy

美国伊利诺伊州芝加哥市

bKL completed three fast-track projects that were critical to ensuring welcoming environments for Chicago Public Schools students upon the start of the school year. All three projects had the same schedules, with design and construction occurring within a limited time frame of 10 total weeks.

A variety of interior and exterior renovations were provided for Leif Ericson Elementary Scholastic Academy. These included classroom, auditorium, library, dining, corridor and toilet room renovations, as well as the remodeling of exterior entrance access routes.

In addition to aesthetic improvements, provisions were made for air conditioning and wireless access points in compliance with the CPS mission to enhance technology and provide climate controlled learning environments.

设计
2013
施工
2013
项目面积
78,000 平方英尺
顾问
Melvin Cohen and Associates, MEP; MFH Associates, 结构
承建商
F.H. Paschen
摄影
Darris Lee Harris